The Procedure For Foundation Excavation In Layton

By Brenda Foster


Excavation is the primary activity of a construction scheme. The process starts from the pits of the building foundations and continues up to the completion of the project. The process involves site clearance, setting out and safety excavation measures based on the depth of pit. Construction of small buildings can be done by use of manual tools such as spades and crow bars. Mechanical equipment will be required for large buildings. The following procedures are involved in foundation excavation in Layton.

The working site should be clean. All unwanted materials such as vegetables, tree stumps and brushwood should be cleared before starting the construction project. Tree roots above 30cm from the groundwork level should be removed. Maintaining an even ground level is important. Therefore, pits left after the removal of rootstocks must be filled up and compacted.

A layout of the ground surface where the construction takes place is set. This is achieved by placing yardsticks at the site and connecting them to the next benchmark. However, different set ups are placed depending on the type of building and the land terrain. Interval levels of 5-10m or 4-8m must be taken. When marking center lines of walls, you can use stretching strings across wooden pegs. Setting up of perpendicular angled walls may be a challenge. You should consider using tapes to mark their center lines to achieve the right angle.

Open planking method is used where the soils are loose and soft. After every excavation side, there are horizontal boards that are placed against each other. Vertical boards are used to support them. They must be marched to similar wood pieces on opposite side of the trench. The collapse of the trench would create great losses. Therefore one should carefully withdraw the pieces of timber to avoid such risks.

All groundwork constructions below the subsoil water level must be dewatered. This is because most constructions pose problems of waterlogging. Several operations such as laying bed concrete and construction of masonry posts should be carried out. Therefore, all works will be carried out effectively if the constructional area is dry.

Maintain the water table to a level of 0.5m below the bottom of the excavation to improve dryness. Various approaches to lowering the water level can be used. Many online sites provide these methods. You should select a site with the information providing the most suitable and economical method of dewatering construction sites.

Different tools and machinery are used in construction. They are used depending on the type of works that is required to be performed. They ease cement mixing procedure that is used in building masonry pillars. The concrete is compressed and placed well. It ought to be a mixture of sand, cement, and coarse aggregate.

You should uphold appropriate measures of protecting and curing the concrete layer. A wet gunny bag should protect the compact two hours after laying it. A continued curing should be done for ten days, but construction can be done after three days.